How long to complete a single Studio Production?

Once we start tracking, it usually takes about seven days to get to the first rough mix, obviously, the timescale is dependent on the complexity of the particular song. (For example, a straightforward rock song with just drums, bass and guitar won’t take as long as a song that requires extensive orchestration). From that point the remixing process is pretty quick, we will usually have it mixed and mastered within a further seven days. So the average song can be completed in roughly two weeks depending on current workloads.